{"name":"Continental Shell LGS vs. wood evaluation","summary":"Compares light gauge steel and wood framing for a development project: framing cost, construction-phase savings, operating savings, asset value, DSCR and equity return.","endpoint":{"method":"POST","path":"/functions/evaluate","content_type":"application/json","describe":"GET the same path for this document"},"required":["Customer: a \"customer\" object for the developer this evaluation is for, with \"name\", \"company\" and \"email\" (required) and \"phone\" (optional). Requests without valid contact details are refused. Continental Shell may follow up with this contact.","Location: \"zip\", or \"state\" with \"latitude\" and \"longitude\" (or \"distance_miles\" from our plant in ZIP 75173). The 50 states and Washington, DC.","Size: \"total_sqft\" and \"stories\", or a \"buildings\" list for multi-building projects."],"fixed":"Material costs (steel, lumber, panel products, concrete and the Continental Shell frame package pricing) come from our current price list and cannot be set by request. Unknown parameters are ignored and listed in ignored_parameters.","project_types":{"apartments":{"label":"Apartments","defaults":{"hard_cost_per_sqft":134.71,"total_cost_per_sqft":168.69,"sqft_per_unit":1791,"monthly_revenue_per_unit":1813.92,"occupancy":0.95,"other_income_pct":0.078,"opex_pct":0.285,"cap_rate":0.055}},"townhomes":{"label":"Townhomes","defaults":{"hard_cost_per_sqft":145,"total_cost_per_sqft":185,"sqft_per_unit":1900,"monthly_revenue_per_unit":2450,"occupancy":0.95,"other_income_pct":0.04,"opex_pct":0.27,"cap_rate":0.055}},"medical":{"label":"Medical","defaults":{"hard_cost_per_sqft":240,"total_cost_per_sqft":310,"sqft_per_unit":5000,"monthly_revenue_per_unit":13500,"occupancy":0.92,"other_income_pct":0.02,"opex_pct":0.3,"cap_rate":0.065,"floor_height_ft":14}},"flex":{"label":"Flex space","defaults":{"hard_cost_per_sqft":115,"total_cost_per_sqft":150,"sqft_per_unit":4000,"monthly_revenue_per_unit":4500,"occupancy":0.93,"other_income_pct":0.01,"opex_pct":0.12,"cap_rate":0.07,"floor_height_ft":18}}},"location_overrides":{"labor_adjustment":"Labor cost relative to Dallas, for example 0.12 for 12% higher (default from state)"},"options":{"current_shaft_assembly":{"default":"CMU","values":["Wood","CMU","Cast-in-place concrete","Precast concrete","Structural steel"]},"assembly_type":{"default":"CFS + non-combustible sheathing/envelope","values":["CFS frame only / hybrid","CFS + non-combustible sheathing/envelope","Fully non-combustible / fire-resistive"]},"original_subfloor, new_subfloor":{"default":"23/32 Plywood Subfloor","values":["23/32 Advantech","Cement Board Subfloor, 3/4\" structural","3\" Composite Deck","1.5\" Composite Deck","AAC Floor Panels","MgO structural subfloor, 3/4\" T&G","23/32 Plywood Subfloor","2\" Composite Deck"]},"original_sheathing, new_sheathing":{"default":"ZIP System Sheathing","values":["7/16\" OSB Sheathing","DensGlass / Glass Mat Sheathing","MgO wall sheathing, 1/2\" to 5/8\"","ZIP System Sheathing","1/2\" OSB Sheathing","5/8\" OSB Sheathing"]},"original_roof_deck, new_roof_deck":{"default":"5/8\" Plywood Subfloor","values":["DensDeck Roof Board, 1/2\" to 5/8\"","Cement Board Subfloor, 3/4\" structural","2\" Composite Deck","MgO Roof Deck Panel, 3/4\" structural","1.5\" Composite Deck","5/8\" Plywood Subfloor","3\" Composite Deck"]}},"buildings":"Each building: total_sqft and levels (required), count, sqft_per_level, perimeter_ft, height_ft, elevator_shafts, elevator_shaft_perimeter_ft, stair_shafts, stair_shaft_perimeter_ft, podium_sqft.","parameters":[{"group":"Building","name":"opening_pct","default":0.1,"description":"Share of exterior wall area that is openings"},{"group":"Building","name":"common_area_factor","default":1.2,"description":"Multiplier on unit MEP work to cover common areas"},{"group":"Building","name":"sqft_per_unit","default":null,"description":"Gross sqft per unit, used to estimate units (set by project_type)"},{"group":"Building","name":"units","default":null,"description":"Number of units, suites or bays (default: total sqft / sqft_per_unit)"},{"group":"Building","name":"floor_height_ft","default":10,"description":"Floor to floor height (medical defaults to 14, flex to 18)"},{"group":"Building","name":"perimeter_ft","default":null,"description":"Building perimeter when not using buildings (default: 4.5 x square root of the footprint)"},{"group":"Building","name":"elevator_shafts","default":null,"description":"Elevator shafts when not using buildings (default by project_type: apartments 2 at four stories and up, medical 2 at two and up, townhomes and flex none)"},{"group":"Building","name":"elevator_shaft_perimeter_ft","default":40,"description":"Average elevator shaft perimeter"},{"group":"Building","name":"stair_shafts","default":null,"description":"Stair shafts when not using buildings (default by project_type: apartments 2 at three stories and up, medical and flex 2 at two and up, townhomes none)"},{"group":"Building","name":"stair_shaft_perimeter_ft","default":80,"description":"Average stair shaft perimeter"},{"group":"Building","name":"podium_sqft","default":0,"description":"Concrete podium area that LGS could replace, when not using buildings"},{"group":"Construction","name":"hard_cost_per_sqft","default":null,"description":"Wood-framed project hard cost per sqft (set by project_type)"},{"group":"Construction","name":"total_cost_per_sqft","default":null,"description":"Total project cost per sqft (set by project_type)"},{"group":"Construction","name":"construction_months","default":null,"description":"Wood-framed construction duration (default scales with size and project_type, for example apartments 10 months + 1 per 33,000 sqft)"},{"group":"Construction","name":"lgs_schedule_savings_months","default":null,"description":"Months saved by prefabricated LGS framing (default: 12.5% of the duration)"},{"group":"Construction","name":"shaft_savings_per_sqft","default":null,"description":"Direct savings per sqft of shaft wall (default from current_shaft_assembly)"},{"group":"Construction","name":"shaft_schedule_savings_months","default":null,"description":"Months saved by LGS shaft walls (default from current_shaft_assembly)"},{"group":"Construction","name":"podium_concrete_cost_per_sqft","default":65,"description":"Concrete podium cost"},{"group":"Construction","name":"podium_lgs_cost_per_sqft","default":45,"description":"LGS replacement cost for the podium"},{"group":"Construction","name":"podium_schedule_savings_months","default":1,"description":"Months saved when a podium is converted"},{"group":"Construction","name":"general_conditions_pct","default":0.05,"description":"General conditions, excluding builder's risk, as a share of hard cost"},{"group":"Construction","name":"gc_time_related_portion","default":0.75,"description":"Share of general conditions that scales with time"},{"group":"Financials","name":"monthly_revenue_per_unit","default":null,"description":"Expected monthly revenue per unit (set by project_type)"},{"group":"Financials","name":"occupancy","default":null,"description":"Expected occupancy (set by project_type)"},{"group":"Financials","name":"other_income_pct","default":null,"description":"Other income as a share of revenue (set by project_type)"},{"group":"Financials","name":"opex_pct","default":null,"description":"Operating expenses as a share of revenue (set by project_type)"},{"group":"Financials","name":"cap_rate","default":null,"description":"Cap rate for the wood-framed asset (set by project_type)"},{"group":"Financials","name":"new_cap_rate","default":null,"description":"Cap rate for the LGS asset (default: cap_rate less 10 basis points)"},{"group":"Financing","name":"construction_interest_rate","default":0.0715,"description":"Construction debt interest rate"},{"group":"Financing","name":"ltc","default":0.7007,"description":"Construction loan to cost"},{"group":"Financing","name":"construction_amort_years","default":30,"description":"Construction debt amortization period"},{"group":"Financing","name":"avg_drawn_balance","default":0.6,"description":"Average share of the construction loan drawn"},{"group":"Financing","name":"ltv","default":0.8,"description":"Permanent loan to value"},{"group":"Financing","name":"perm_interest_rate","default":0.041,"description":"Permanent debt interest rate"},{"group":"Financing","name":"perm_amort_years","default":35,"description":"Permanent debt amortization period"},{"group":"Financing","name":"hold_years","default":10,"description":"Hold period after construction"},{"group":"Insurance","name":"builders_risk_wood_pct","default":0.02,"description":"Builder's risk for combustible framing, share of hard cost per year"},{"group":"Insurance","name":"builders_risk_lgs_pct","default":null,"description":"Builder's risk for LGS (default from assembly_type)"},{"group":"Insurance","name":"replacement_value_factor","default":1.15,"description":"Replacement value as a multiple of hard cost"},{"group":"Insurance","name":"perm_insurance_wood_pct","default":0.0075,"description":"Property insurance for combustible framing, share of replacement value per year"},{"group":"Insurance","name":"perm_insurance_lgs_pct","default":null,"description":"Property insurance for LGS (default from assembly_type)"},{"group":"Wood labor","name":"wood_labor_min","default":7,"description":"Wood framing field labor per sqft, low"},{"group":"Wood labor","name":"wood_labor_max","default":10,"description":"Wood framing field labor per sqft, high"},{"group":"Wood labor","name":"wood_engineering_min","default":0.5,"description":"Wood engineering per sqft, low"},{"group":"Wood labor","name":"wood_engineering_max","default":0.75,"description":"Wood engineering per sqft, high"},{"group":"Wood labor","name":"wood_delivery_min","default":0,"description":"Wood delivery per sqft, low"},{"group":"Wood labor","name":"wood_delivery_max","default":0,"description":"Wood delivery per sqft, high"},{"group":"LGS labor","name":"lgs_installation_min","default":6.5,"description":"LGS installation per sqft, low"},{"group":"LGS labor","name":"lgs_installation_max","default":7.5,"description":"LGS installation per sqft, high"},{"group":"LGS labor","name":"lgs_design_min","default":0.8,"description":"LGS design and engineering per sqft, low"},{"group":"LGS labor","name":"lgs_design_max","default":1,"description":"LGS design and engineering per sqft, high"},{"group":"Foundation","name":"wood_dead_load_psf","default":14,"description":"Wood framing dead load"},{"group":"Foundation","name":"lgs_dead_load_psf","default":10.5,"description":"LGS framing dead load"},{"group":"Foundation","name":"soil_bearing_psf","default":1500,"description":"Allowable soil bearing"},{"group":"Foundation","name":"footing_depth_ft","default":1,"description":"Footing depth"},{"group":"Foundation","name":"foundation_load_factor","default":1.3,"description":"Factor applied to the load reduction"},{"group":"MEP","name":"mep_labor_rate","default":85,"description":"MEP labor rate per hour"},{"group":"MEP","name":"electric_hole_minutes","default":1.5,"description":"Minutes to drill one electrical hole"},{"group":"MEP","name":"electric_holes_per_unit","default":40,"description":"Electrical holes per unit"},{"group":"MEP","name":"plumbing_hole_minutes","default":3,"description":"Minutes to drill one plumbing hole"},{"group":"MEP","name":"plumbing_holes_per_unit","default":15,"description":"Plumbing holes per unit"},{"group":"MEP","name":"mechanical_hole_minutes","default":5,"description":"Minutes to drill one mechanical hole"},{"group":"MEP","name":"mechanical_holes_per_unit","default":10,"description":"Mechanical holes per unit"},{"group":"Site","name":"dumpster_capacity_cy","default":30,"description":"Dumpster capacity in cubic yards"},{"group":"Site","name":"wood_waste_cy_per_sqft","default":0.004,"description":"Wood framing waste per sqft"},{"group":"Site","name":"dumpster_fill_rate","default":0.75,"description":"Share of dumpster capacity filled"},{"group":"Site","name":"dumpster_pull_cost","default":900,"description":"Cost per dumpster pull"},{"group":"Site","name":"drywall_labor_per_sqft","default":2.25,"description":"Drywall labor per sqft of floor"},{"group":"Site","name":"cladding_labor_per_sqft","default":4.5,"description":"Cladding labor per sqft of wall"},{"group":"Site","name":"finish_savings_factor","default":0.05,"description":"Drywall and cladding labor saved on straight LGS walls"},{"group":"Operations","name":"pest_baseline_pct","default":0.0005,"description":"Pest and termite treatment, share of hard cost per year"},{"group":"Operations","name":"pest_savings","default":0.95,"description":"Share of pest cost avoided with LGS"},{"group":"Operations","name":"mold_baseline_pct","default":0.0003,"description":"Mold and moisture remediation, share of hard cost per year"},{"group":"Operations","name":"mold_savings","default":0.95,"description":"Share of mold cost avoided with LGS"},{"group":"Operations","name":"maintenance_baseline_pct","default":0.0008,"description":"Maintenance and repairs, share of hard cost per year"},{"group":"Operations","name":"maintenance_savings","default":0.75,"description":"Share of maintenance cost avoided with LGS"},{"group":"Operations","name":"fire_baseline_pct","default":0.00092,"description":"Fire claims and deductibles, share of hard cost per year"},{"group":"Operations","name":"fire_savings","default":0.95,"description":"Share of fire cost avoided with LGS"},{"group":"Operations","name":"wind_baseline_pct","default":0.0006,"description":"Wind and storm damage, share of hard cost per year"},{"group":"Operations","name":"wind_savings","default":0.85,"description":"Share of wind cost avoided with LGS"},{"group":"Operations","name":"warranty_baseline_pct","default":0.00268,"description":"Warranty, callbacks and rework, share of hard cost per year"},{"group":"Operations","name":"warranty_savings","default":0.8,"description":"Share of warranty cost avoided with LGS"}],"example_request":{"customer":{"name":"Jordan Lee","company":"Lee Development Group","email":"jordan@example.com","phone":"214-555-0142"},"zip":"76209","project_type":"apartments","total_sqft":180000,"stories":4,"cap_rate":0.055,"hold_years":10}}